By 1924 the church had outgrown the Sunday School building built in 1901 and located behind the sanctuary. Today the 1901 building houses the Leavitt choir room and the soup cellar. In April 1926 a building committee was elected, and plans were developed for a new three-story building of brick and stone, fronting on Washington Street and connected with the sanctuary. In March 1927 a finance committee was elected to raise the approximately $100,000 cost of the building. Since the new building was to be erected over part of the church cemetery adjacent to the sanctuary, the church agreed to move graves for families who made the request. In most cases they were moved to Elmwood Cemetery. Other graves were undisturbed. A plat was made of the cemetery, so that graves might be located in the future. This file is a transcription of the gravestones on that plat. The new Educational and Administration building was completed by the fall of 1928, and the congregation celebrated its opening the weekend of September 21-23.
Can’t find what you’re looking for? Give us a call at 803-256-2417, or e-mail us at [email protected].